CLASSIFICATION
NORTH-BENZ-BRAND
CONTACT-US
- Name: Baotou beiben Trading Co.,
- Mobile phone: 13327188003
- Mobile:13664067905
- Tel: 0472-3610990
- FAX: 0472-3610990
- Q Q:350013459
- E-mail:350013459@qq.com
A special truck used to transport concrete for construction, consisting of a chassis and a concrete mixer. It is one of the important equipment of "one station and three cars", and undertakes the task of transporting the commodity concrete from the mixing station safely, reliably and efficiently to the construction site. Therefore, the use of mixer attention is very important, many people want to know. Here are some tips for sharing the use of the mixer.
1, when the new car starts to use, must carry on the comprehensive inspection and the test run, when everything is normal, may use formally.
2, concrete conveying capacity, quality and collapsbillity shall comply with the provisions in chapter second.
3. When the mixer is parked in the open field, the mixing drum shall be reversed before loading, and the water (or rain) and sundries in the cylinder will be discharged to ensure the quality of the transported concrete.
4, in the hopper, discharge chute next to work, should be equipped with protective equipment. Do not approach the hopper and the mixing port. Do not look inside, nor can you touch the rotating drum with your hands.
5, driving on the highway, long chute must flip placed in the discharge chute on the hook and then go to prison, and the body vertical position, a locking device for the discharge chute and lengthened chute locking on the rack, to prevent the not fixed and shaking, causing accidents and other vehicle operation.
6, the car through the bridge, holes, libraries and other facilities, we must pay attention to the height of the size and weight of the road, so as not to damage the mixer.
7, the working equipment running time shall not exceed 8h.
8, time of delivery, such as the discovery of water evaporation, low slump can not meet the requirements of users, may be appropriate to add water to the cylinder, and then rotate at 30 RPM speed after 12 14r/min discharge.
9, mixing truck in no-load operation and delivery of concrete process, the mixing drum can not stop rotating, so as to avoid raceway, roller partial touch damage or concrete segregation.
10, Baotou North Benz parts of the water tank to fill, for a rainy day. The water tank must be opened before the water is added. The exhaust valve in the north of Baotou must be opened. The air in the box will be released, and the gas pump must be turned off in time.
Caution: the tank is pressurized only when it is supplied with water. Do not run on the road with a pressurized water tank.
11, winter parking, water tanks and water supply system, there may be no residual water.
12 、 whether the discharging chute and lengthened chute need to be used together, determined by the requirements of the specific working position.
13, full load concrete is turning, if you want to reverse, you must Baotou North Ben spare parts control handle, so that the steady turn, stop, and then manipulate the handle reversal. It is strictly prohibited to turn the handle to reverse during the forward rotation.